Verdivurdering Nordic Quartz
Last updated: 29.06.2016
KVINNHERAD QUARTZ | Low | Base case - 35% | Medium low | Base case - 15% | Base case | Base case + 15% | Medium high | Base case + 35% | High | Unit |
Resource estimate Quartz (~ 99.998 % SiO2) | 1,50 | 1,95 | 2,25 | 2,55 | 3,0 | 3,45 | 3,75 | 4,05 | 4,50 | mill. tonnes |
Yearly production (~ 99.998 % SiO2) | 3750 | 4125 | 4375 | 4625 | 5000 | 5375 | 5625 | 5875 | 6250 | tonnes |
Recovery grade | 19 % | 21 % | 22 % | 23 % | 25 % | 27 % | 28 % | 29 % | 31 % | |
Estimated mine life | 75 | 97,5 | 112,5 | 127,5 | 150 | 172,5 | 187,5 | 202,5 | 225 | years |
Market value ~ 99.998 % SiO2 | 7500 | 9750 | 11250 | 12750 | 15000 | 17250 | 18750 | 20250 | 22500 | USD/ton |
OPEX | 1650 | 2145 | 2475 | 2805 | 3300 | 3795 | 4125 | 4455 | 4950 | USD/ton |
Exchange rate USD/NOK | 6,44 | 7,08 | 7,51 | 7,94 | 8,58 | 9,22 | 9,65 | 10,08 | 10,73 | |
Yearly profit | 141 | 222 | 288 | 365 | 502 | 667 | 794 | 936 | 1176 | MNOK |
Total profit | 11 | 22 | 32 | 47 | 75 | 115 | 149 | 189 | 265 | MRD NOK |
Base investment | 185 | 241 | 278 | 315 | 370 | 426 | 463 | 500 | 555 | MNOK |
Payback cost | 135 % | 149 % | 158 % | 167 % | 180 % | 194 % | 203 % | 212 % | 225 % | |
Total investment cost | 250 | 357 | 437 | 524 | 666 | 823 | 937 | 1056 | 1249 | MNOK |
NPV | 10,3 | 21,3 | 32,0 | 46,0 | 74,6 | 114,2 | 148,0 | 188,4 | 263,4 | MRD NOK |
Number of shares | 517,2 | 517,2 | 517,2 | 517,2 | 517,2 | 517,2 | 517,2 | 517,2 | 517,2 | shares |
Share value | 20 | 41 | 62 | 89 | 144 | 221 | 286 | 364 | 509 | NOK/share |
Share value P/E = 20 | 5,5 | 8,6 | 11,1 | 14,1 | 19,4 | 25,8 | 30,7 | 36,2 | 45,5 | NOK/share |
Share value P/E = 15 | 4,1 | 6,4 | 8,4 | 10,6 | 14,6 | 19,3 | 23,0 | 27,1 | 34,1 | NOK/share |
Share value P/E = 10 | 2,7 | 4,3 | 5,6 | 7,1 | 9,7 | 12,9 | 15,4 | 18,1 | 22,7 | NOK/share |
Sist oppdatert: 20.09.2015
Sist oppdatert: 20.09.2015
Lav | Snitt | Høy | Enhet | |
Forekomst Quartz (~ 99.998 % SiO2) | 2 | 3 | 4 | mill tonn |
Produksjonstid | 50 | 60 | 70 | år |
Årlig quartz-produksjon(~ 99.998 % SiO2) | 4000 | 5000 | 6000 | tonn |
Salgsverdi ~ 99.998 % SiO2) | 8000 | 16500 | 25000 | USD/tonn |
Break even | 3300 | 3300 | 3300 | USD/tonn |
Profitt pr tonn ~ 99.998 % SiO2 | 4700 | 13200 | 21700 | USD/tonn |
29.12.2014: 1 USD = 7,4 NOK | 6,72 | 7,47 | 8,22 | NOK/USD |
Profitt pr tonn ~ 99.998 % SiO2 | 31598 | 98604 | 178309 | NOK/tonn |
Årlig profitt | 126 | 493 | 1070 | mill. kr |
Total profitt | 6,3 | 29,6 | 74,9 | mrd. kr |
Minus investeringskostnader | 0,34 | 0,37 | 0,41 | mrd. kr |
Total profitt etter investeringer | 6,0 | 29,2 | 74,5 | mrd. kr |
Antall aksjer pr. 29.12.2014 | 308,5 | 308,5 | 308,5 | mill. aksjer |
Bidrag aksjeverdi | 19,4 | 94,7 | 241,4 | kr/aksje |
"Analysis show the quartz from the Kvinnherad deposit is of very high purity. Advanced processing tests show that the impurity level can be reduced by physical and chemical processing to a level of the best products in the market, comparable with the Iota 4 and Iota 6 high-purity quartz (“HPQ”) products."
"Nordic Mining has carried out comprehensive analysis and an advanced processing test program at Dorfner Anzaplan’s laboratory in Germany. A suitable processing route for the quartz has been developed. To confirm that high quality products could be obtained from a larger part of the deposit three samples of 250 to 500 kg, in addition to an existing 1,000 kg sample, have been blasted from different locations across the vein. Homogeneity of the quartz has been confirmed by processing of all the samples to high quality products both in terms of impurity levels and glass qualities."
"The Scoping study estimated a preliminary size of the deposit of 3.45 million tonnes of quartz down to 150 meters depth. The estimate was based on geological mapping and geophysical results and is not in accordance with the JORC Code. No drilling of the deposit has been done so far. Drilling will be a necessary next step to confirm deposit size and quality. The Scoping Study indicated an initial mine life of more than 40 years based on mining down to about 100 meters depth and production of 5,000 tonnes of high purity quartz concentrate per year. The Scoping Study estimated a preliminary after tax NPV of USD 60 million using 8% WACC based on a 30 years project period."